CASE STUDY 10 – LEWISHAM

Project: Leadwork installation associated with damp remediation.Location: Lewisham, LondonStatus: Completed Pictures before and during K&A Chartered Surveyors were appointed to inspect issues in relation to damp ingress to a neighbouring property. It was established there were issues with both the boundaries of the channel drains and also with penetrating damp. It was decided that the […]

CASE STUDY 9 – BRIXTON RESIDENTIAL

Project: Emergency structural repairs and external renovation programme to a block of flats in South West London.Location: Brixton, LondonStatus: Completed Pictures before and during K&A Chartered Surveyors were appointed to provide Project Management services in relation to the emergency structural repairs as well as an external refurbishment programme to a block of flats in South […]

CASE STUDY 8 – CATFORD

Project: Extension of a dormer loft conversion, single storey rear extension, external repairs and internal refurbishment programme.Location: Catford, LondonStatus: Completed Pictures before and during K&A Chartered Surveyors were appointed to provide Project Management and Party Wall services in relation to the construction of a dormer loft extension and internal refurbishment works at a residential property […]

CASE STUDY 7 – BRIXTON COMMERCIAL

Project: Emergency external repair and decoration programme.Location: Commercial Offices in Brixton, LondonStatus: Completed Pictures before and during K&A Chartered Surveyors were appointed to provide Project Management services for the emergency external repair and decoration programme to a commercial property which is located near the A3 road in South West London. Some of the works included […]

CASE STUDY 6 – BLACKHEATH

Project: Roof overlaying and external repair and decoration programme.Location: Blackheath, LondonStatus: Completed Pictures before and during K&A Chartered Surveyors were appointed to undertake Project Management and Contract Administrator services for the external works carried out to a residential block above commercial units, which is located in the heart of the Blackheath Conservation Area in South […]

CASE STUDY 5 – FOREST HILL

Project: Restoration project to a fire and water damaged purpose-built block of flats.Location: Forest Hill, South East LondonStatus: Completed K&A Chartered Surveyors were appointed to provide Project Management services for the restoration works to a fire damaged block of flats in Forest Hill, London. The restoration works includes replacement of the roof, external repair and […]

CASE STUDY 4 – SUTTON AT HONE

Project: Barn to Office conversion projectLocation: Sutton at Hone, KentStatus: Completed We are pleased to announce the completion of the Barn conversion project in Sutton at Hone, Kent. K&A Chartered Surveyors were employed by a commercial client to project manage and provide Architectural services of the partial demolition and re-building of part of the first-floor […]

CASE STUDY 3 – PECKHAM

Location: Peckham, South East LondonStatus: Completed We were instructed to provide Planning, Architectural and Project Management services to restore the fire-damaged timber-constructed Grade II listed property. The property comprises a mixture of ground-floor retail and first and second upper floor residential/storage units. The works have comprised of replacement, repair, refurbishment, redecoration and removal of structural […]

CASE STUDY 2 – SURREY QUAYS

Project: External repair and decoration programme and the construction of a mansard roof extension.Location: Surrey Quays, South East LondonStatus: Completed K&A Chartered Surveyors were employed to provide Project Management services for the external repair and redecoration scheme to the exterior of the property and the construction of an additional floor level above using a mansard […]

CASE STUDY 1 – TEDDINGTON

Project: Refurbishment, remodelling, alterations, and extension works to a mix use commercial and residential property.Location: Teddington, South-West LondonStatus: Completed We are pleased to have recently signed-off and received the Building Control certificate for a major project, which has seen remodelling, extensions, demolition and retrofitting works carried out to a former mix-use residential and commercial premises […]